How To Apply For Electricity In Uganda

What Is Electricity?

Electricity is the set of physical phenomena associated with the presence and motion of matter that has a property of electric charge. Electricity is related to magnetism, both being part of the phenomenon of electromagnetism, as described by Maxwell’s equations.

How To Apply For Electricity In Uganda

Procedure
  • Make sure that the place which you want to apply power for is well built and you would have done already with things ranging from earthing to full wiring by an experienced electrician with a Certificate of operation from the electricity distribution company.
  • Go to the nearest offices and get the application forms, fill in the application form all the details information.
  • Pay a surveying fee Of Ugandan shilling 43,000(forty three thousand shilling only) at any bank of your choice in Uganda
  • Submit the filled in application form with detailed information to nearest office, attach the receipt payment for surveying fee.
  • An installation inspector or surveyor will then visit your place to verify that the wiring and earthing conform to required standards, and will be required to fill an inspection survey form at site. AD-20 form will be prepared if you pass all the required tests of conformity. In most cases it take an average time of five (5) days to two(2) week
  • Once the installation is found to be in conformity with set standards, internal processing of your application will be effected.
  • After your application is verified , you will be required to pay a capital contribution of:
    • Uganda shilling 98,000 (ninety eight thousand shilling only) for no pole service
    • Uganda shilling 326,000 (three hundred twenty six thousand shilling only) for one (I) pole service
    • Uganda shilling 100,000 (one hundred thousand shilling only) as a security deposit for domestic consumers of single phase supply
    • Uganda shilling 200,000 ( two hundred thousand shilling only) for both commercial consumer of single- phase supply and three-phase ordinary supply
  • Upon completion of the payment your connection will then begin

The Required Information When Applying For Electricity In Uganda

  • Full name
  • Zone
  • Type of service (domestic or commercial)
  • Telephone number
  • Date of birth
  • Valid identity proof
  • Citizenship
  • Address
  • Occupation
  • Pass port size photograph with a white background
  • A company stamp in case of a company
  • Proof of ownership in case of the original land owner.
  • Tenancy Agreement and passport size photograph of the landowner ( for tenants)

What Is The Required Documents When Applying For Electricity In Uganda?

  • Filled in application form with all the detail information
  • A sketch map of to your premises and the account number of the neighbor in case he/she has electricity.
  • Type of service( domestic or commercial)
  • A company stamp in case of a company
  • Proof of ownership in case of a landlord
  • Tenancy agreement and passport size photograph of the landlord (for tenants)
  • Valid identity proof.

What Is The Eligibility When Applying For Electricity In Uganda?

  • Individuals with a Building
  • Companies with building or factories are eligible to have to power

Fees To Pay When Applying For Electricity In Uganda

  1. 43,000 (forty three thousand shilling only) for domestic inspection connection.
  2. 47,200 ( forty seven thousand two hundred only) for commercial inspection connection
  3. 88,500 (eighty eight thousand five hundred shilling only) plus load declaration for a three phase connection
  4. 118,000 (one hundred and eighteen thousand shilling only) plus load declaration for KVA
  5. 98,000( ninety eight thousand shilling only ) for no pole service
  6. 326,000( three hundred and twenty six thousand shilling only ) for one pole service
  7. 100,000(one hundred thousand) for a security deposit for domestic consumers of single- phase supply
  8. 200,000 ( two hundred thousand shilling only ) for both commercial consumers of single phase supply and three- phase ordinary supply.

What Is The Validity When Applying For Electricity In Uganda?

For a long time so longer as you pay the Bills.

The Instructions When Applying For Electricity In Uganda

Electricity surveyor who is competent enough is required to visit your premises to inspect the proper wiring, insulation and installation of earthing process ,This person is licensed by distribution company, to inspect the electrical wiring process in premises.

The Processing Time For Electricity In Uganda

The maximum processing time is one (1) to two (2) weeks for you to have power installed in your place.

Need For The Document When Applying For Electricity In Uganda

Ugandas power and energy Distribution Company formed in 2004 with a mandate to networking, supply and connection of power. In order for individual in Uganda to get access to power you have to visit their main office in Kampala or their office branches country wide.

Information Which Might Help When Applying For Electricity In Uganda

Currently Electricity distribution company is undergoing a process of change code named Yaka, which will see all the old metering kind of postpaid meters being replaced with the new prepaid meters and so far done a few areas like Mubuya, parts of Natete and others are so far done with the migration.

How Much Does It Cost To Connect Electricity In Uganda?

The Approved New Connection Cost is inclusive of Meter Test Fees of Ush 8,000 payable to Uganda National Bureau of Standards. Inspection Fees Applicable: Ush 41,300.

The New Electricity Connection Charges.

Type of connectionLabour and Transport Standardized Cost (Ush)
Single-phase – No pole50,000
Single-phase – 1 pole210,000
Three-phase – No pole90,000

How Can I Get Electricity Connection In Uganda?

What you need to Get Connected

  1. APPLICATION & REGISTRATION. Apply Online. Pay inspection fees through our payment channels (Mobile money & banks)
  2. INSPECTION. Upon payment of inspection fees, our team will visit you for inspection.
  3. PAYMENT & CONNECTION. Upon successful inspection, You will pay connection fees.

How Much Is Yaka Meter In Uganda?

For Domestic package it is 41,500 UGX, for Commercial package it is 48,000 UGX for Medium Industrial package it is 88,000 UGX and for the Large Industrial package it is 118,000. New connection deposits and charges for the Yaka Umeme Uganda.

How Do I Apply For Yaka Meter?

The Process

  1. Step 1: Application & Registration. Pick and fill out a form at Umeme and pay the inspection fees.
  2. Step 2: Inspection. The Umeme team will visit you for inspection in 2 working days.
  3. Step 3: Meter Installation. A meter will be installed within 5 working days after payment.

How Much Is A Unit Of Yaka In Uganda?

A domestic consumer who consumes the low Voltage single phase supplied at 240 volts will have their unit price reduced from UGX 750.9 to UGX 747.5, while a unit for commercial use now costs UGX 616.6 up from UGX 639.8.

Office Locations & Contacts When Applying For Electricity In Uganda

Electricity distribution co.
P0 B0X 23841
Kampala Uganda
For general inquiries call
0312185185
0414185185
0752185185
0702185185 or toll free 0800185185
E-mail: info@umeme.co.ug
Website: http://www.umeme.co.ug