We have provided a full budget for Building a four bedroom house in Uganda. This house plan has a living room with dinning, 4 bedrooms, a bathroom and a kitchen. This budget considers most of the price changes that have occurred since 2020 corona virus pandemic.

A breakdown of estimated materials for a four bedroom house construction as below.

No of bricks 143715costing 35928750

Bags of cement 112 costing 5040000

No of iron sheets 84 costing 4620000

Number of timber trusses 168 costing 1344000

Kilos of roof nails 50 kgs costing 270000

Timber nails 50 kgs costing 270000

Trucks of sand 10 trips costing 1500000

Trucks of aggregate concrete 4 trips costing 600000

Trucks of hardcore stones 4 trips costing 800000

Litres paint 160 litres costing 2360000

Number of tiles 810 tiles costing 1215000

Tile adhesive 16 bags costing 480000

Iron bars 21 beam bars costing 1050000

Doors and windows 8 windows and 7 doors costing 4400000

Labour complete labour costs 5987775

The average estimated costs of building a 4 bedroom house is considered to be 65865525 million shillings. Finding additional costs is possible but those costs may not alter this estimated budget by more or less than 10%.