A breakdown of estimated materials for a four bedroom house construction as below.
No of bricks 143715costing 35928750
Bags of cement 112 costing 5040000
No of iron sheets 84 costing 4620000
Number of timber trusses 168 costing 1344000
Kilos of roof nails 50 kgs costing 270000
Timber nails 50 kgs costing 270000
Trucks of sand 10 trips costing 1500000
Trucks of aggregate concrete 4 trips costing 600000
Trucks of hardcore stones 4 trips costing 800000
Litres paint 160 litres costing 2360000
Number of tiles 810 tiles costing 1215000
Tile adhesive 16 bags costing 480000
Iron bars 21 beam bars costing 1050000
Doors and windows 8 windows and 7 doors costing 4400000
Labour complete labour costs 5987775
The average estimated costs of building a 4 bedroom house is considered to be 65865525 million shillings. Finding additional costs is possible but those costs may not alter this estimated budget by more or less than 10%.